Robotics Bottleneck Research机器人瓶颈研究

Main主页 / thesis / scoring-review

CE-N evidence and rating rulesCE-N 证据与评分规则

Evidence requirements for rating reviews. The website displays the current approved CE-N score.

评分评审的证据要求。网站展示当前已批准的 CE-N 分数。

How ratings are reviewed

The owner has approved these evidence requirements and rating anchors for the pilot. Applying them to new scores still requires review and approval. The website shows one current approved CE-N score per bottleneck; candidate scores, earlier versions, and comparison tables remain in the source repository.

Rating anchors

Ratings 2 and 4 require an explicit explanation of what places the evidence between the adjacent anchors. Missing evidence stays unrated; it must not default to 1. Decimal ratings need a documented reason for that precision.

Axis135
BudgetEvidence shows no funded procurement route in the defined use caseFunded trials or limited paid deploymentsRepeated paid adoption with identified budget owners across the defined scope
SolvabilityEvidence shows the defined task is not reliably achievedRepeatable performance in a restricted setting with stated assistanceRepeatable performance under intended conditions with measured reliability and support needs
Value captureEvidence shows little retained margin or defensibilityA demonstrated route to revenue, with unresolved competition or support costRepeated evidence of retained economics and defensibility after full delivery costs
PainMeasured impact is limited within the use caseMeasurable operating burden with workable alternativesMaterial recurring loss or constraint, with limited acceptable alternatives
TimingDocumented prerequisites remain unmet within the stated horizonAdoption is possible but depends on identified milestonesProcurement conditions and required capabilities are in place within that horizon
MaturityEarly experimental evidenceRepeatable pilots in defined settingsEstablished deployments and support practices across the defined scope

Evidence about one company or one task cannot automatically justify a high rating for an entire bottleneck. Define the task coverage, counterexamples, and aggregation rule before assigning a new rating.

Required explanation for each rated input

Record the scope and horizon; source and date; evidence class; supporting observation; contradictory evidence; chosen anchor; reason for the rating; and what would change the assessment. Assess evidence confidence separately from commercial attractiveness.

Publication rule

Every replacement score requires an approved assessment and calculation. Until then, the current published score remains in place. Missing evidence stays unknown; a partial company example cannot replace a bottleneck-wide assessment.

Readers can inspect the current calculation and commercial evidence requirements. Review packets and score history are maintained with the source repository.

如何评审评分

负责人已批准在试点中使用这些证据要求与评分基准。新评分仍需单独评审批准。网站为每个瓶颈展示一个当前已批准的 CE-N 分数;候选评分、旧版本与比较表保留在源代码仓库。

评分基准

以下基准用于试点评审。评为 2 或 4 时,应解释证据为什么处于相邻基准之间。证据缺失保持未评级,不能默认记为 1。小数评级需要说明精度依据。

维度1 分3 分5 分
预算证据显示定义场景内没有已获资金的采购路径已有资金支持的试点或少量付费部署定义范围内有明确预算负责人及重复付费采用
可解性证据显示尚不能可靠完成定义任务在受限环境下可重复完成,人工协助明确在预期条件下可重复完成,可靠性与支持需求可测量
价值获取证据显示保留利润或防御能力有限收入路径已得到展示,但竞争或支持成本仍待解决扣除全部交付成本后,持续保留收益并具备防御能力
痛点场景内测得的影响有限有可测量运营负担,但替代方案可用持续造成重大损失或约束,合适替代方案有限
时机在明确期限内,必要条件仍未满足可以采用,但依赖明确里程碑期限内采购条件与必要能力均已具备
成熟度早期实验性证据在定义场景内可重复试点定义范围内已有成熟部署与支持实践

一家公司的一个任务表现不能自动支持整个瓶颈的高评级。新评级前,应明确任务覆盖、反例与汇总规则。

每项输入必须解释什么

记录范围与期限、来源与日期、证据类别、支持观察、相反证据、所选基准、评级理由,以及什么会改变判断。证据置信度与商业吸引力分别评估。

发布规则

替换分数需要经批准的评估与计算。在此之前,保留当前已发布分数。证据缺失保持未知;单个公司的案例不能替代整个瓶颈的评估。

读者可以查看当前计算方法及商业证据要求。评审材料与评分历史保存在源代码仓库。